Product Introduction
Product Introduction
Prefabricated plastic running track features safety, environmental friendliness, excellent weather resistance, economic durability, and colorful effects. It is safe and convenient to install: only the special adhesive provided in our supporting set is needed, and the track coil material can be paved on a solid base with a small amount of manpower and mechanical assistance. The track can be put into normal use 24 hours after installation. Moreover, it has the characteristic of being maintenance-free.
Performance Features
1. It has good resistance to acid rain, alkali, ultraviolet rays, and mold;
2. It has a high cost-performance ratio, which can bring maximum returns to the investment in sports venues;
3. The non-dazzling multi-color combination adds to the beauty of the sports field;
4. There is no phenomenon of grain shedding or chipping, and it has a certain self-cleaning performance;
5. It is convenient to install.
Construction Process
First, check the flatness of the base layer and level the uneven parts (e.g., acid washing is required for cement concrete bases);
Primer laying: Before laying the primer, clean the foundation thoroughly and prepare the tools needed for construction;
A. Measure the position of the construction line according to the process requirements and set up the construction line;
B. When laying, start from one side of the site and scrape the adhesive in one go according to the width of the site;
C. Scrape the adhesive at a uniform speed, and timely fill or smooth out any exposed bottoms, depressions, or protrusions;
D. After the adhesive is formed, inspect the entire site to ensure the thickness of the top adhesive laying.
Top adhesive paving:
A. When scraping the adhesive, try to shorten the interval time between each bucket of adhesive to ensure the uniform curing speed of the formed adhesive;
B. Always observe the thickness of the adhesive surface;
C. Scrape the top adhesive, and before the top adhesive is cured, spread red particles. After it is completely cured, clean up the excess top adhesive particles;
D. Spray adhesive to ensure that the particles do not fall off.
Process line spraying: Accurately measure the position of the process line in accordance with the current standards for track and field facilities, and then spray with polyurethane paint.
Prefabricated plastic running track features safety, environmental friendliness, excellent weather resistance, economic durability, and colorful effects. It is safe and convenient to install: only the special adhesive provided in our supporting set is needed, and the track coil material can be paved on a solid base with a small amount of manpower and mechanical assistance. The track can be put into normal use 24 hours after installation. Moreover, it has the characteristic of being maintenance-free.
Performance Features
1. It has good resistance to acid rain, alkali, ultraviolet rays, and mold;
2. It has a high cost-performance ratio, which can bring maximum returns to the investment in sports venues;
3. The non-dazzling multi-color combination adds to the beauty of the sports field;
4. There is no phenomenon of grain shedding or chipping, and it has a certain self-cleaning performance;
5. It is convenient to install.
Construction Process
First, check the flatness of the base layer and level the uneven parts (e.g., acid washing is required for cement concrete bases);
Primer laying: Before laying the primer, clean the foundation thoroughly and prepare the tools needed for construction;
A. Measure the position of the construction line according to the process requirements and set up the construction line;
B. When laying, start from one side of the site and scrape the adhesive in one go according to the width of the site;
C. Scrape the adhesive at a uniform speed, and timely fill or smooth out any exposed bottoms, depressions, or protrusions;
D. After the adhesive is formed, inspect the entire site to ensure the thickness of the top adhesive laying.
Top adhesive paving:
A. When scraping the adhesive, try to shorten the interval time between each bucket of adhesive to ensure the uniform curing speed of the formed adhesive;
B. Always observe the thickness of the adhesive surface;
C. Scrape the top adhesive, and before the top adhesive is cured, spread red particles. After it is completely cured, clean up the excess top adhesive particles;
D. Spray adhesive to ensure that the particles do not fall off.
Process line spraying: Accurately measure the position of the process line in accordance with the current standards for track and field facilities, and then spray with polyurethane paint.