Product Introduction
Construction Process
1. Base layer: Grind and clean; the base surface is required to be dry, flat and free of hollowing;
2. Primer coating: Seal the base surface to enhance adhesion;
3. Intermediate coating: Machine trowel sand pressing, sand patching or putty leveling according to the designed thickness;
4. Epoxy flat topcoat painting.
1. Base layer: Grind and clean; the base surface is required to be dry, flat and free of hollowing;
2. Primer coating: Seal the base surface to enhance adhesion;
3. Intermediate coating: Machine trowel sand pressing, sand patching or putty leveling according to the designed thickness;
4. Epoxy flat topcoat painting.
Construction Process
1. Base layer treatment;
2. Pre-paving for construction;
3. PVC installation;
4. Seam welding;
5. Site cleaning.
1. Base layer treatment;
2. Pre-paving for construction;
3. PVC installation;
4. Seam welding;
5. Site cleaning.