Product details
Product Introduction
Construction Process  
1. Base layer: Grind and clean; the base surface is required to be dry, flat and free of hollowing;  
2. Primer coating: Seal the base surface to enhance adhesion;  
3. Intermediate coating: Machine trowel sand pressing, sand patching or putty leveling according to the designed thickness;  
4. Epoxy flat topcoat painting.  
Construction Process  
1. Base layer treatment;  
2. Pre-paving for construction;  
3. PVC installation;  
4. Seam welding;  
5. Site cleaning.